Back to homeTechnology · 4th ESO B · Change subject
Start for free
ESO Y4B · Technology
The technology project · Problem solving

The phases of a technology project

No useful technical object comes from simply starting to cut material. Behind it lies a project method: a process made up of linked phases, each with a checkable deliverable, which turns a poorly defined problem into a solution that has been built, tested and documented.

Before you start, make sure you know: The phases of a technology project (1st ESO)
Before you start, make sure you know: Project documentation (3rd ESO)

The technology project method

Any technical challenge, however different it may seem, is solved by working through the same basic framework of phases.

Flowchart of the five phases of the technology project: need, research, design, manufacture and evaluation, with a return arrow from evaluation back to the earlier phases. the process is iterative: a fault means going back to an earlier phase need research design manufac- ture evaluation
Practice★☆☆Not started
These stages of a technology project are out of order: (a) building the prototype, (b) identifying the need, (c) evaluation and improvement, (d) researching information,…

These stages of a technology project are out of order: (a) building the prototype, (b) identifying the need, (c) evaluation and improvement, (d) researching information, (e) designing the solution. Put them in the correct order and explain in one sentence what is done in each stage.

Solve
Practice★☆☆Not started
Define in your own words what the 'need' that sets a technology project in motion is, and write down two real needs in your classroom or school that could become a…

Define in your own words what the 'need' that sets a technology project in motion is, and write down two real needs in your classroom or school that could become a project.

Solve
Practice★☆☆Not started
Explain what a prototype is and explain why the first prototype is almost never the final product.

Explain what a prototype is and explain why the first prototype is almost never the final product.

Solve

Stating the need and carrying out research

The process begins with a problem written in such a way that it can later be checked whether the solution solves it.

Comparison between a vague idea, «something cool», and a verifiable need: a recycled cardboard stand on the desk that holds the phone horizontally during a user's video call. ? ? ? ? «something cool» ✗ not verifiable ✓ verifiable user desk horizontal material recycled video call
Practice★☆☆Not started
Explain what is done during the research stage and why it is useful to do it before designing. Give an example applied to this challenge: building a mobile phone holder…

Explain what is done during the research stage and why it is useful to do it before designing. Give an example applied to this challenge: building a mobile phone holder using recycled materials.

Solve
Practice★☆☆Not started
A team writes their need as follows: 'we want to make a cool device'. Rewrite it in a specific and verifiable way: for whom, what problem it solves, and in what context…

A team writes their need as follows: 'we want to make a cool device'. Rewrite it in a specific and verifiable way: for whom, what problem it solves, and in what context it will be used.

Solve
Practice★★☆Not started
In a project to create a school raised bed, research reveals that watering at dusk significantly reduces evaporation. Explain how this information can alter the design…

In a project to create a school raised bed, research reveals that watering at dusk significantly reduces evaporation. Explain how this information can alter the design of the irrigation system and why doing research first saves work later.

Solve

Design and manufacture: documentation as a contract

The design phase does not end with an attractive sketch: it must deliver the complete documentation that makes it possible to manufacture without improvising.

Three design documents (a dimensioned drawing, a bill of materials with tick boxes and a budget with amounts) come together in the workshop, where a frame of profiles is manufactured on the bench without improvising. € drawings bill of materials budget manufacture without improvising
Practice★☆☆Not started
In the manufacturing stage, why is it better to follow the plans and the list of materials instead of improvising as you go along? Explain two specific risks of…

In the manufacturing stage, why is it better to follow the plans and the list of materials instead of improvising as you go along? Explain two specific risks of improvising.

Solve
Practice★★☆Not started
Explain the difference between the design stage and the construction stage, and explain why it is advisable to have the design finished (plans, list of materials, and…

Explain the difference between the design stage and the construction stage, and explain why it is advisable to have the design finished (plans, list of materials, and budget) before starting to build.

Solve
Practice★★☆Not started
Your team has ten sessions for a complete project. Divide the sessions among the five stages in a reasoned way and justify why evaluation needs its own time slot rather…

Your team has ten sessions for a complete project. Divide the sessions among the five stages in a reasoned way and justify why evaluation needs its own time slot rather than 'whatever is left over'.

Solve

Evaluation and iteration of the process

The project does not end when the prototype is built: you have to check systematically whether it meets the need and, if it does not, go back to an earlier phase.

Diagram of the iteration loop: from design you move to evaluation and, if this detects a fault, a dashed return arrow goes back to design with what has been learned. design evaluation test fails? if it fails, go back to design with what you have learned: that is iterating
Practice★★☆Not started
Explain with an example why the evaluation stage may force a return to the design stage, or even to research, and explain why going back should not be considered a…

Explain with an example why the evaluation stage may force a return to the design stage, or even to research, and explain why going back should not be considered a failure.

Solve
Practice★★★Not started
A group is working on a school wind turbine to power a 5 V circuit. Their test log shows the following data: Version 1: 3 flat PVC blades (0° angle), wind at 20 km/h →…

A group is working on a school wind turbine to power a 5 V circuit. Their test log shows the following data:

  • Version 1: 3 flat PVC blades (0° angle), wind at 20 km/h → 0,8 V generated. Diagnosis: the rotor does not generate enough torque due to a lack of lift.

  • Version 2: 3 curved profile blades (15° angle), wind at 20 km/h → 3,6 V generated, but with critical vibration on the shaft at 400 rpm.

  • Version 3: Same blades as V2 at 15°, dynamic balancing counterweights and ball bearings are added → 4,9 V at 450 rpm without vibration.

  1. a) Based on the data, technically refute the statement: "The team failed twice before getting it right". Demonstrate how each step constitutes an iteration based on the 'measure - learn - redesign' loop.
  2. b) Explain what would have happened if the team had resorted to 'blind trial and error' instead of technological iteration guided by physical parameters.
Solve
Practice★★★Not started
A team has 6 weeks (12 1-hour sessions) to build an automated greenhouse with microcontroller-based irrigation control. Their initial linear planning was: Weeks 1 and 2:…

A team has 6 weeks (12 1-hour sessions) to build an automated greenhouse with microcontroller-based irrigation control. Their initial linear planning was:

  • Weeks 1 and 2: Information search and 3D design of the model.

  • Week 3: Purchase of sensors and materials.

  • Weeks 4 and 5: Construction of the model and circuit assembly with Arduino.

  • Week 6: Code programming.

Upon reaching week 6, they discover that the soil moisture sensor outputs an analog signal that is incompatible with the configured reference voltage and the water pump draws more current than allowable, burning out an output on the board.

  1. a) Identify the critical task sequencing and dependency errors in this linear planning. Why should programming and unit testing of components not be left for the final phase?
  2. b) Restructure the project using a concurrent (parallel) task diagram and introduce at least three intermediate "control milestones" with technical passing conditions to avoid reaching the end with integration failures.
Solve

Summary

See all the exercises in this section