BAC1 tech · Technology and Engineering I
Research and development projects · The product and its documentation

Product life cycle, metrology and quality control

A technical product does not stop existing when it leaves the factory: it has a complete journey, from the moment it is designed to the moment it is thrown away or recycled, and at every stage we must check that it meets what is required of it. Measuring precisely, accepting or rejecting parts using clear criteria and improving the process systematically are engineering tasks just as important as the design itself.

Before you start, make sure you know: The life cycle of a product (4th ESO)
Before you start, make sure you know: Intervals, half-lines and neighbourhoods (4th ESO)

The product life cycle

Analysing a product stage by stage makes it possible to improve its environmental and economic impact far beyond the moment it is manufactured.

Diagram with the five stages of the product life cycle: design, manufacture, distribution and sale, use and maintenance, and end of life, linked by arrows. design manufacture distribution and sale use and maintenance end of life
Practice★☆☆Not started
These phases of a product's life cycle are jumbled: (a) use and maintenance, (b) manufacturing, (c) end of life (recycling or disposal), (d) design, (e) distribution and…

These phases of a product's life cycle are jumbled: (a) use and maintenance, (b) manufacturing, (c) end of life (recycling or disposal), (d) design, (e) distribution and sales. Put them in order and explain in one sentence what happens in each.

Solve
Practice★☆☆Not started
At the end of a product's useful life, there are several options: repair, reuse, recycle or dispose of. Order them from most to least sustainable and explain the…

At the end of a product's useful life, there are several options: repair, reuse, recycle or dispose of. Order them from most to least sustainable and explain the difference between reusing and recycling, giving an example of each.

Solve
Practice★★★Not started
A telecommunications company claims in its advertising campaign that its new model is "50% more sustainable" because its packaging is made of recycled cardboard and the…

A telecommunications company claims in its advertising campaign that its new model is "50% more sustainable" because its packaging is made of recycled cardboard and the charger has been removed from the box. Average data from a Life Cycle Assessment (LCA) for this type of handset reveals the following greenhouse gas emissions breakdown: raw material extraction and component manufacturing: 78%; transport and distribution: 4%; use and recharging over two years: 16%; end of life and waste treatment: 2%.

(a) Quantitatively refute the company's claim and justify why this action represents an obvious case of greenwashing.

(b) Identify the critical stage (hotspot) of the life cycle and calculate how much the prorated annual impact would be reduced if, through modular design and spare parts availability, the phone's lifespan were doubled from 2 to 4 years.

(c) Propose two specific technical decisions that the design team should adopt in the product conception phase to ensure its repairability and effective recycling at the end of its life.

Solve

Metrology and dimensional tolerances

No manufactured part measures exactly the figure written on the drawing: there is always a small variation, and metrology sets how much variation is acceptable.

Representation of a nominal dimension with its tolerance interval and examples of an accepted and a rejected part. 19,9 mm 20,0 mm 20,1 mm accepted part outside tolerance
Practice★☆☆Not started
Explain what metrology is and name two common measuring instruments in a technology workshop, indicating what quantity each measures and in which unit.

Explain what metrology is and name two common measuring instruments in a technology workshop, indicating what quantity each measures and in which unit.

Solve
Practice★☆☆Not started
Vernier calipers are a common instrument in the workshop. Explain what physical quantity they measure, to what approximate precision they operate (tenths of a…

Vernier calipers are a common instrument in the workshop. Explain what physical quantity they measure, to what approximate precision they operate (tenths of a millimetre) and what you would use them for when verifying a newly manufactured part.

Solve
Practice★★☆Not started
A shaft must measure $25 \pm 0{,}2\ \text{mm}$. Measuring five parts yields the following measurements: $25{,}1\ \text{mm}$, $24{,}7\ \text{mm}$, $25{,}2\ \text{mm}$,…

A shaft must measure $25 \pm 0{,}2\ \text{mm}$. Measuring five parts yields the following measurements: $25{,}1\ \text{mm}$, $24{,}7\ \text{mm}$, $25{,}2\ \text{mm}$, $24{,}9\ \text{mm}$ and $25{,}3\ \text{mm}$. Calculate the acceptable range of measurements and state which parts pass quality control and which do not, justifying each case.

Solve

Quality control: 100 % inspection or sampling

Checking every part one by one is not always the best strategy: sometimes it is better to inspect only a representative sample of the batch.

Comparison between 100 % inspection, which checks all the parts on a production line and detects the defective one, and sampling, which checks only some of the parts in the batch. 100 % inspection serious failure (safety) every part is checked sampling minor, cheap failure a sample is checked
Practice★☆☆Not started
A shaft must measure $20 \pm 0{,}1\ \text{mm}$, meaning any measurement between $19{,}9\ \text{mm}$ and $20{,}1\ \text{mm}$ is acceptable. In the figure, the…

A shaft must measure $20 \pm 0{,}1\ \text{mm}$, meaning any measurement between $19{,}9\ \text{mm}$ and $20{,}1\ \text{mm}$ is acceptable. In the figure, the measurements of three parts (A, B and C) have been represented on the tolerance line, as shown in the figure.

19,9 mm 20,0 mm 20,1 mm A B C tolerance limits in red

State which parts are accepted and which are rejected, and explain what it means for a part to be 'out of tolerance'.

Solve
Practice★★☆Not started
To check $20 \pm 0{,}1\ \text{mm}$ shafts in series production, a "go/no-go" gauge is used: it has one end calibrated at $20{,}1\ \text{mm}$, through which the shaft…

To check $20 \pm 0{,}1\ \text{mm}$ shafts in series production, a "go/no-go" gauge is used: it has one end calibrated at $20{,}1\ \text{mm}$, through which the shaft MUST pass, and another at $19{,}9\ \text{mm}$, through which it must NOT pass. Explain how this gauge is used, what advantage it has in production compared with measuring each shaft with a caliper, and what information is lost with it.

Solve
Practice★★☆Not started
Some parts are inspected one by one (100% inspection) and others by sampling (only a few from each batch are checked). Explain when each strategy is appropriate and…

Some parts are inspected one by one (100% inspection) and others by sampling (only a few from each batch are checked). Explain when each strategy is appropriate and justify it with two examples: hardware screws and car seatbelt pretensioners.

Solve

Control charts and tolerance stack-up

Quality control does not end with accepting or rejecting individual parts: we must also monitor whether the manufacturing process stays stable over time.

Time-based control chart with a centre line and statistical limits where one batch exceeds the upper limit. UCL CL LCL batch out of control
Practice★★☆Not started
A control chart records the mean diameter of shafts produced in eight batches, with the central line (CL) and upper and lower control limits (UCL, LCL), as shown in the…

A control chart records the mean diameter of shafts produced in eight batches, with the central line (CL) and upper and lower control limits (UCL, LCL), as shown in the figure.

mm UCL CL LCL 1 2 3 4 5 6 7 8 batch

(a) State which batch falls outside the control limits. (b) Explain what it means for a process to be 'out of control' and how this differs from normal variation between batches. (c) Propose two immediate actions for the company to take (regarding the machine and the parts from that batch).

Solve
Practice★★★Not started
In the turning of steel pins, a nominal dimension of $50{,}00 \pm 0{,}20\ \text{mm}$ is specified. A consecutive sample of 10 parts is taken at the end of a work shift,…

In the turning of steel pins, a nominal dimension of $50{,}00 \pm 0{,}20\ \text{mm}$ is specified. A consecutive sample of 10 parts is taken at the end of a work shift, yielding the following diameters in millimeters:

$49{,}90;\ 50{,}15;\ 50{,}30;\ 50{,}05;\ 49{,}80;\ 50{,}10;\ 50{,}25;\ 49{,}75;\ 50{,}00;\ 50{,}35$.

(a) Determine which parts do not meet the design specifications and classify them with reasoning into non-recoverable parts (scrap) and parts that allow rework (re-turning on the lathe).

(b) Calculate the sample mean $\bar{x}$ and the sample range $R$. Compare the sample range with the allowable tolerance interval and interpret whether the main problem with the process lies in a centering error (zero offset) or in excessive intrinsic variability (dispersion).

(c) Knowing that the operation consists of external turning, predict with reasoning how tool tip wear affects the resulting diameter of the parts and what compensation must be introduced into the CNC program to correct it.

Solve
Practice★★★Not started
The support of a mobile robot consists of a housing into which three rectangular parts $A$, $B$, and $C$ must be inserted in series. The assigned manufacturing…

The support of a mobile robot consists of a housing into which three rectangular parts $A$, $B$, and $C$ must be inserted in series. The assigned manufacturing dimensions are:

• Width of the housing cavity: $L = 80{,}40 \pm 0{,}15\ \text{mm}$.

• Thickness of part $A$: $a = 20{,}00 \pm 0{,}10\ \text{mm}$.

• Thickness of part $B$: $b = 35{,}00 \pm 0{,}12\ \text{mm}$.

• Thickness of part $C$: $c = 25{,}00 \pm 0{,}08\ \text{mm}$.

For the assembly to work without binding or vibrating, the assembly clearance $J = L - (a + b + c)$ must strictly be between $0{,}05\ \text{mm}$ and $0{,}75\ \text{mm}$.

(a) Perform a tolerance stack-up analysis using the worst-case method and determine the minimum possible clearance ($J_{\min}$) and maximum possible clearance ($J_{\max}$).

(b) Interpret the results: predict whether there is a risk of interference (inability to assemble the parts) or excessive clearance, and indicate under which combination of extreme dimensions failure would occur.

(c) If tightening the machining tolerances of the parts increases the product cost by $40\ \%$, propose an alternative mechanical design solution (without changing the tolerances of $A$, $B$, and $C$) that guarantees the correct fit of the mechanism.

Solve

Quality standards and continuous improvement

Complying with a recognised standard and improving systematically reduce the costs of poor quality far more than correcting defects that have already been manufactured.

PDCA continuous improvement cycle: Plan, Do, Check and Act, with arrows between stages and a dashed arrow returning from Act to Plan. 1 Plan Do Check Act Continuous improvement: the cycle repeats
Practice★★☆Not started
Explain what a technical standard is (for example, an ISO or UNE standard) and why manufacturers are interested in complying with it. Give an example of an everyday…

Explain what a technical standard is (for example, an ISO or UNE standard) and why manufacturers are interested in complying with it. Give an example of an everyday product whose safety or compatibility depends on a standard.

Solve
Practice★★☆Not started
Distinguish between quality control (detecting defective products) and continuous improvement (preventing defects from occurring in the first place). Give an example of…

Distinguish between quality control (detecting defective products) and continuous improvement (preventing defects from occurring in the first place). Give an example of each concept in a bicycle factory and explain why the second strategy usually proves cheaper in the long run.

Solve
Practice★★★Not started
In the technology workshop, $25\ \%$ of the tin-soldered joints in the circuits of robotics projects present functional defects (cold solder joints, short circuits…

In the technology workshop, $25\ \%$ of the tin-soldered joints in the circuits of robotics projects present functional defects (cold solder joints, short circuits caused by solder bridges, or components coming loose after a few hours of use).

(a) P Phase (Plan): Apply the Ishikawa diagram to identify at least four root causes of the problem grouped according to the 4Ms (Manpower, Materials, Machinery/Tools, and Methods). Based on them, formulate a testable technical working hypothesis.

(b) D Phase (Do) and C Phase (Check): Design a small-scale experimental test plan to validate the hypothesis proposed in the previous phase without stopping the work of the entire group. Define which measurable variable you will record and which quantitative success criterion will determine if the solution is valid.

(c) A Phase (Act): Assuming that the experimental test has reduced the defective solder joint rate to $3\ \%$, propose two specific standardization measures in the workshop to ensure that this improvement does not deteriorate with subsequent cohorts of students.

Solve

Marketing and logistics of the product

Marketing defines who the product is for, what value it provides, how it is communicated and through which channel it is sold. Logistics organises procurement, stock, storage, transport, delivery and returns. Designing without planning for these steps can produce an object that is technically viable but economically or environmentally unviable.

The product goes out to the user; returns open up a route for repair or recovery.

Diagram of the logistics chain from the supplier to the user with the return flow for recovery. Supplier Manufacture Warehouse User Return: repair, reuse or recycle

As evidence for the project, hand in a budget, a justified demand forecast, a delivery plan and a plan for handling returns. Review the design if the packaging or breakages wipe out the expected margin.

Summary