ESO Y1 · Technology and Digitalisation
The technology project · The project method

The phases of a technology project

A bridge, a chair, a coat rack: no technical object appears out of nowhere. Behind each one there is a need that has been identified and an orderly route to meet it. That route is called the project method, and in this section you will get to know its six phases.

What problem does a technology project solve?

Every project begins in the same way: someone realises that something doesn't work well, is missing or is inconvenient, and decides to look for a solution.

Diagram showing how an everyday problem is turned into a design question and into its technical solution by means of a coat rack. "The coats end upon the floor" How could wehang them up? Wall-mounted coat rack

The first step is always to turn the complaint ("this doesn't work") into a design question ("how could we...?"). That question guides the whole project.

Practice★☆☆Not started
Technology exists to solve needs. Name the need solved by each object: (a) an umbrella; (b) a coat rack; (c) a reusable bottle; (d) a footbridge. Then identify two needs…

Technology exists to solve needs. Name the need solved by each object: (a) an umbrella; (b) a coat rack; (c) a reusable bottle; (d) a footbridge. Then identify two needs in your classroom that could be solved with a simple object.

Solve
Practice★☆☆Not started
'The coats in the classroom always end up on the floor or over the chairs.' Identify the need behind this statement, formulate the problem with a question ('how could…

'The coats in the classroom always end up on the floor or over the chairs.' Identify the need behind this statement, formulate the problem with a question ('how could we...?') and propose a simple object to solve it.

Solve

The six phases: a cycle, not a straight line

Circular diagram with the six phases of the project method: need, information, design, planning, construction and evaluation, with arrows closing the cycle. 1. Need 2. Information 3. Design 4. Plan 5. Build 6. Evaluate
Practice★☆☆Not started
These are the phases of a technology project, but in the wrong order: (a) build, (b) identify the need, (c) design with sketches, (d) evaluate and improve, (e) research…

These are the phases of a technology project, but in the wrong order: (a) build, (b) identify the need, (c) design with sketches, (d) evaluate and improve, (e) research information, (f) plan the work. Put them in the correct order and explain in one sentence what is done in each phase.

Solve
Practice★☆☆Not started
The figure shows the cycle of a technology project: the phases are linked in a ring because the last phase can take us back to the first ones, but one phase is covered…

The figure shows the cycle of a technology project: the phases are linked in a ring because the last phase can take us back to the first ones, but one phase is covered by a question mark, as shown in the diagram.

Identify the need Research information Design Plan Build ?

Which phase is covered up? Explain why the cycle is a ring and not a line that ends: what can happen when you check whether what you built works?

Solve
Practice★☆☆Not started
True or false? Justify each answer: (a) it is a good idea to start building before having any design; (b) evaluation can force us to return to the design phase; (c)…

True or false? Justify each answer: (a) it is a good idea to start building before having any design; (b) evaluation can force us to return to the design phase; (c) researching information before designing gives ideas and avoids mistakes; (d) a project always ends as soon as the object is built.

Solve

Finding information and designing: sketches and plans

Before drawing the final solution, it is worth looking at how other similar objects solve that same problem. This phase, finding information, saves mistakes and gives you ideas.

Comparison between a freehand sketch of a wall-mounted coat rack, with quick strokes and no measurements, and its dimensioned plan: a 35 cm long and 5 cm high batten, and 10 cm between hooks. freehand sketch quick, no measurements batten 35 cm 5 cm 10 cm plan with measurements precise, with exact dimensions
Practice★☆☆Not started
Match each phase with its corresponding activity: (a) design, (b) plan, (c) evaluate, (d) research information. Activities: 1. make sketches and dimensioned drawings; 2.…

Match each phase with its corresponding activity: (a) design, (b) plan, (c) evaluate, (d) research information. Activities: 1. make sketches and dimensioned drawings; 2. test whether the object works and write down improvements; 3. look at how similar objects solve the same problem; 4. make a list of materials, tools and steps to follow.

Solve
Practice★☆☆Not started
What is a sketch? Explain the difference between a quick freehand sketch and a dimensioned drawing, and what each one is used for during the design phase.

What is a sketch? Explain the difference between a quick freehand sketch and a dimensioned drawing, and what each one is used for during the design phase.

Solve
Practice★★☆Not started
Explain the difference between a sketch and a dimensioned plan using the example of a coat rack: what each one provides, which one you would do first, and what could…

Explain the difference between a sketch and a dimensioned plan using the example of a coat rack: what each one provides, which one you would do first, and what could happen if you built the piece guided only by the sketch.

Solve

Planning the work: what, who and when

A good design can be ruined if nobody organises who does what and in which order. Planning means deciding that before picking up a tool.

Gantt chart with three linked tasks: information in week 2, design between weeks 2 and 3, and building from week 3 to its end. Week 1 Week 2 Week 3 Information Design Build
Practice★★☆Not started
The figure shows the four-week schedule of a team building a coat rack, as shown in the diagram. Read the schedule and answer: which tasks are done in week 2? Which task…

The figure shows the four-week schedule of a team building a coat rack, as shown in the diagram.

Week 1 Week 2 Week 3 Week 4 Research information Design Buy materials Build Evaluate and improve

Read the schedule and answer: which tasks are done in week 2? Which task must be finished before buying the materials? If building took two weeks instead of one, what would happen to the rest of the plan?

Solve
Practice★★☆Not started
Before designing a coat rack for the classroom backpacks, you need to research information. Make a list of four things it would be useful to find out (how many backpacks…

Before designing a coat rack for the classroom backpacks, you need to research information. Make a list of four things it would be useful to find out (how many backpacks there are, how much they weigh when full, how much free space there is on the wall, what commercial coat racks are like) and explain how each piece of information affects the final design.

Solve
Practice★★☆Not started
A team of four people must build a box in three workshop sessions. Propose a breakdown of tasks per person and per session, explain why it is advisable to write it down…

A team of four people must build a box in three workshop sessions. Propose a breakdown of tasks per person and per session, explain why it is advisable to write it down before starting, and what you would do if someone is absent on the construction day.

Solve
Practice★★☆Not started
'Planning is a waste of time: I prefer to start as soon as possible.' Respond to this idea with two arguments (missing materials halfway through the work, mistakes that…

'Planning is a waste of time: I prefer to start as soon as possible.' Respond to this idea with two arguments (missing materials halfway through the work, mistakes that cost time and money) and an example from the workshop.

Solve

Building, evaluating and starting again

Building means following the plan step by step, but the work doesn't end there: you have to check whether the object fulfils its function.

Technical cycle: after building, the object is evaluated and, if it doesn't work, a dashed arrow goes back to redesign and build again. Build Evaluate does it fulfil its function? if it doesn't work, redesign
Practice★★☆Not started
Your team is going to build a wooden box to store the classroom's cables. Describe what you would do in each of the six project phases, from identifying the need to…

Your team is going to build a wooden box to store the classroom's cables. Describe what you would do in each of the six project phases, from identifying the need to evaluating the result, in one or two sentences per phase.

Solve
Practice★★☆Not started
Your lolly-stick bridge collapses when the first weight is placed on it during testing. Which phase of the project are you in? Explain the two options you can take…

Your lolly-stick bridge collapses when the first weight is placed on it during testing. Which phase of the project are you in? Explain the two options you can take (improve the joints, change the design) and why failing the test does not mean the project has failed.

Solve
Practice★★☆Not started
After building the object, you must evaluate it. Write an evaluation form with four questions (does it fulfil its function?, is it stable and safe?, could it be made…

After building the object, you must evaluate it. Write an evaluation form with four questions (does it fulfil its function?, is it stable and safe?, could it be made with less material?, what would you improve?) and explain what each question contributes to the next project.

Solve
Practice★★★Not started
A team built a coat rack that tipped over when the first backpack was hung on it. Analyse which phase or phases you think they failed in (did they identify the need…

A team built a coat rack that tipped over when the first backpack was hung on it. Analyse which phase or phases you think they failed in (did they identify the need incorrectly?, was the design unstable?, did they consider it finished without testing it?) and explain how you would check this by talking to them.

Solve
Practice★★★Not started
Two teams build the same lolly-stick bridge using the same material: one supports $5\ \text{kg}$ and the other breaks with $1\ \text{kg}$. Reason which phases of the…

Two teams build the same lolly-stick bridge using the same material: one supports $5\ \text{kg}$ and the other breaks with $1\ \text{kg}$. Reason which phases of the method best explain this difference and what you would do to help the 'weaker' team improve their bridge without starting from scratch.

Solve
Practice★★★Not started
During the strength tests of a bridge made of toothpicks and hot-melt glue, the following results are obtained: With a load of $1,0\text{ kg}$, the structure does not…

During the strength tests of a bridge made of toothpicks and hot-melt glue, the following results are obtained:

  • With a load of $1,0\text{ kg}$, the structure does not creak, but noticeable bending is observed in the bottom chord.

  • Upon reaching $1,4\text{ kg}$, the toothpicks remain intact (none have broken), but three joints of the central truss detach and the bridge collapses completely (the target set was $3,0\text{ kg}$).

  1. a) Based on these data, interpret what the real failure was: material strength or joint stiffness and adhesion? Justify your deduction.
  2. b) Propose two specific redesign modifications to reach $3,0\text{ kg}$ without increasing the total weight of the bridge by more than $20\,\%$.
  3. c) Design a progressive test protocol to evaluate the improvements without destroying the structure on the first attempt.
Solve

Working as a team, documenting and keeping to the budget

Almost all workshop projects are done as a team and with limited money. Here are two more things that the project method helps to organise.

Two team members contribute to the project report, a document that records the cost, the design and the improvements. Person 1 Person 2 Project report € Cost Design Improvements
Practice★☆☆Not started
In the workshop, projects are done in teams. Name three advantages of working in a team (sharing tasks, having more ideas, helping each other with mistakes) and one…

In the workshop, projects are done in teams. Name three advantages of working in a team (sharing tasks, having more ideas, helping each other with mistakes) and one difficulty that might arise, explaining how you would solve it.

Solve
Practice★★★Not started
A classmate wants to make a phone stand for their study desk that allows the phone to be placed both horizontally (to watch videos) and vertically (for video calls while…

A classmate wants to make a phone stand for their study desk that allows the phone to be placed both horizontally (to watch videos) and vertically (for video calls while charging without straining the cable), using a single scrap of plywood measuring $15 \times 10\text{ cm}$.

  1. a) Justify which two key technical pieces of data from the "Information search" phase they need to measure before drawing any cut on the wood.
  2. b) Design and describe a solution that meets the geometric and functional requirements using that single scrap.
  3. c) In the "Evaluation" phase, design a specific technical test to check that the stand does not tip over due to center of gravity instability when pressing hard on the upper part of the screen.
Solve
Practice★★★Not started
Upon finishing a project in the workshop, a student states: "The technical report is a waste of time; if the object is already built and works, writing what we did is…

Upon finishing a project in the workshop, a student states: "The technical report is a waste of time; if the object is already built and works, writing what we did is completely useless." Rebut their stance by answering these questions:

  1. a) Imagine that in two months another 1st year ESO class wants to reproduce your project but using recycled plastic instead of wood. Justify which two sections of the report they will definitely need to consult and what would happen if they had not been written.
  2. b) During construction, a part did not fit as shown in the initial sketch and you had to modify its dimensions on the fly. Justify technically why it is essential to reflect that change in the report instead of leaving the initial blueprint.
Solve
Practice★★★Not started
To build a workshop parts sorter, your team is hesitating between two technical solutions: Proposal A: $5\text{ mm}$ plywood, joints using slots and white wood glue.…

To build a workshop parts sorter, your team is hesitating between two technical solutions:

  • Proposal A: $5\text{ mm}$ plywood, joints using slots and white wood glue. Material cost: $3,20\text{ €}$. Requires $90\text{ min}$ of work with a fretsaw and sandpaper.

  • Proposal B: $3\text{ mm}$ recycled grey cardboard, joints reinforced with masking tape and cardboard brackets. Material cost: $0,80\text{ €}$. Requires $40\text{ min}$ of work with a craft knife and ruler.

The project constraints are: a maximum budget of $2,00\text{ €}$ per team, a time limit of 2 workshop sessions ($100\text{ min}$ in total), and it must support heavy tools without deforming throughout the entire school year.

  1. a) Build a table with three weighted technical assessment criteria and score both proposals with justifications.
  2. b) Determine which proposal should be selected based on your scores.
  3. c) Propose a specific modification for the non-selected proposal that allows it to overcome its weaknesses without breaching the constraints.
Solve
Practice★★★Not started
In the planning phase of a box with a lid to store components, you have a strict, non-extendable budget limit of $14,00\text{ €}$. The planned materials and their unit…

In the planning phase of a box with a lid to store components, you have a strict, non-extendable budget limit of $14,00\text{ €}$. The planned materials and their unit prices are:

  • Plywood board ($60 \times 40\text{ cm}$): $5,20\text{ €}$

  • Pine strip ($1\text{ m}$): $2,10\text{ €}$ (2 strips are needed)

  • Metal hinges: $1,30\text{ €}$ each (3 hinges are planned)

  • Latch lock: $1,80\text{ €}$

  • Wood screws: $0,05\text{ €}$ each (4 screws per hinge and 4 for the latch are required)

  • Contact adhesive: $1,50\text{ €}$

  1. a) Prepare the itemized budget table and calculate the total projected cost.
  2. b) Check whether the design is economically feasible. If it exceeds the budget, propose and justify two design or material changes that allow the cost to be reduced below $14,00\text{ €}$ while maintaining the movable lid and the locking functionality.
Solve
Practice★★★Not started
Two groups of 1st year ESO students manufacture a workshop stand using plastic profiles and screws: Group A ("adventurers"): Starts cutting and drilling the material in…

Two groups of 1st year ESO students manufacture a workshop stand using plastic profiles and screws:

  • Group A ("adventurers"): Starts cutting and drilling the material in the first session without blueprints or a parts list. They waste 3 profiles due to measurement errors, take 6 workshop hours, and the final stand is wobbly.

  • Group B ("design process"): Spends two sessions measuring, making dimensioned sketches, and writing the process sheet; they manufacture in the third session. They use exactly the allocated material, take 4 hours in total, and the stand passes quality control.

  1. a) Analyze which specific phases of the technological process Group A ignored and what direct technical consequence each omission had.
  2. b) If a company were to manufacture 5.000 stands using Group A's method, predict the economic and environmental sustainability consequences compared to Group B's method.
  3. c) A student from Group A argues: "We were more practical because we worked with the tools from minute one without wasting time on paperwork." Rebut their stance technically using the time and quality data from the case.
Solve

Summary